Goliath Successfully Completes 48,443 Meters Of Drilling in 97 Drill Holes in 94 Days, With A 100% Hit Rate And Expands Footprint Of High-Grade Surebet Gold Discovery To 2.01 Km2 That Remains Open, Golddigger Property, Golden Triangle, B.C.
Goliath Resources wrapped up its 2026 drill program at the Surebet gold discovery in British Columbia's Golden Triangle with 48,443 meters drilled across 97 holes, expanding the high-grade system's footprint 12% to 2.01 km2 that remains open. Continuity metrics stayed exceptional: 100% of holes to date intersected quartz-sulphide mineralization, 85% of 483 holes contain visible gold, and 83 holes from 2026 are still awaiting assays into the new year. For the filer, the relevance is indirect — McEwen Inc.
Key figures
- Drill rigs
- 7
- Best intercept
- 34.52 g/t AuEq over 39.00 m (GD-24-260, Golden Gate Zone)
- Holes drilled 2026
- 97
- Meters drilled 2026
- 48443
- Holes pending assays
- 83
- Surebet footprint km2
- 2.01
- Visible gold hit rate
- 412 of 483 holes (85%)
- Property size hectares
- 91518
- Footprint expansion pct
- 12% increase from 1.8 km2
- Quartz sulphide hit rate
- 100% of holes to date
- Au metallurgical recovery
- 92.2%
- Cumulative meters drilled
- over 200,000 since the maiden program in 2021
- Bonanza zone expansion km2
- 1.27 to 1.51
- Golden gate zone expansion km2
- 0.85 to 1.17
AI analysis
Red flags4 · Pro
The rest of the AI analysis, red flags and sentiment are part of Signal8 Pro.
AI-generated analysis of a public disclosure. Not investment advice; verify against the original document.