Skip to main content
Signal8

Full Access with Signal8 Pro, $49/mo billed annually.

Integra Identifies New Near-Mine Gold Growth Targets at Florida Canyon, including 1.30 g/t Au over 62.5 m and 0.59 g/t Au over 167.6 m Inter-Pit and 0.48 g/t Au over 54.9 m in New Madre Shear North Target

$ITRGPress releaseSep 23, 2026, 6:30 AM ETRead the release

Integra Resources reported new drill results from its producing Florida Canyon Mine in Nevada, headlined by 1.30 g/t Au over 62.5 m and 0.59 g/t Au over 167.6 m in the Inter-Pit area between the Central and Radio Tower open pits. A newly identified Madre Shear North Target returned 0.48 g/t Au over 54.9 m, with roughly 2,000 m drilled to date and another 2,000 m planned; the zone sits beneath the North Dump and could become accessible as dump material is mined.

Key figures

Best intercept
1.30 g/t Au over 62.5 m (FCMR26-1250, Central/Radio Tower Saddle)
Wide intercept
0.59 g/t Au over 167.6 m (FCMR26-1162)
Madre shear north
0.48 g/t Au over 54.9 m (FCMR26-1284)
Meters drilled 2026
30140
Reserve increase prior
74%
Planned standard mine drilling
7,000 m

AI analysis

Red flags2 · Pro

The rest of the AI analysis, red flags and sentiment are part of Signal8 Pro.

AI-generated analysis of a public disclosure. Not investment advice; verify against the original document.