TRISO-X Completes Vertical Construction of TX-1 Fuel Fabrication Facility
TRISO-X, a wholly-owned subsidiary of X-Energy (Nasdaq: XE), completed vertical construction of its 214,000-square-foot TX-1 advanced nuclear fuel fabrication facility in Oak Ridge, Tennessee. The project now shifts to interior buildout and installation of fuel fabrication equipment under Clark Construction. Once operational, TX-1 is expected to produce roughly 700,000 TRISO-X fuel pebbles annually — about 5 metric tons of uranium — enough for up to 11 Xe-100 reactors.
Key figures
- Facility size sqft
- 214,000
- License term years
- 40
- Annual capacity mtu
- 5
- Annual fuel pebbles
- 700,000
- Campus expansion acres
- 70
- Reactor capacity xe100
- 11
AI analysis
The rest of the AI analysis, red flags and sentiment are part of Signal8 Pro.
AI-generated analysis of a public disclosure. Not investment advice; verify against the original document.