Skip to main content
Signal8

TRISO-X Completes Vertical Construction of TX-1 Fuel Fabrication Facility

$XEPress releaseSep 24, 2026, 7:00 AM ET

TRISO-X, a wholly-owned subsidiary of X-Energy (Nasdaq: XE), completed vertical construction of its 214,000-square-foot TX-1 advanced nuclear fuel fabrication facility in Oak Ridge, Tennessee. The project now shifts to interior buildout and installation of fuel fabrication equipment under Clark Construction. Once operational, TX-1 is expected to produce roughly 700,000 TRISO-X fuel pebbles annually — about 5 metric tons of uranium — enough for up to 11 Xe-100 reactors.

Key figures

Facility size sqft
214,000
License term years
40
Annual capacity mtu
5
Annual fuel pebbles
700,000
Campus expansion acres
70
Reactor capacity xe100
11

AI analysis

The rest of the AI analysis, red flags and sentiment are part of Signal8 Pro.

AI-generated analysis of a public disclosure. Not investment advice; verify against the original document.

    XE: TRISO-X Completes Vertical Construction of TX-1 Fuel Fabrication Facility — AI Analysis | Signal8