Q2 Metals Reports Multiple Wide Intercepts, Including 264.6 Metres at 1.84% Li₂O and 152.9 Metres at 1.59% Li₂O in Drill Hole 71 at the Cisco Lithium Project in Quebec, Canada
Q2 Metals reported strong drill results from its 2026 Winter Drill Program at the Cisco Lithium Project in Quebec, highlighting wide, high-grade intercepts. Key results include 264.6 metres at 1.84% Li2O and 152.9 metres at 1.59% Li2O in drill hole 71, confirming the main mineralized zone. These results support the April 2026 Inferred Mineral Resource Estimate of 295 million tonnes grading 1.36% Li2O, making it the largest hard rock lithium deposit in the western hemisphere.
Key figures
- Resource grade
- 1.36% Li2O
- Resource tonnes
- 295 million tonnes
- Best interval grade
- 1.84% Li2O
- Best interval length
- 264.6 metres
- Drill metres reported
- 5,909 metres
- Project area hectares
- 41,253 hectares
- Drill metres completed
- 10,515 metres
- Summer drill plan metres
- 20,000 metres
AI analysis
The rest of the AI analysis, red flags and sentiment are part of Signal8 Pro.
AI-generated analysis of a public disclosure. Not investment advice; verify against the original document.