Skip to main content
Signal8

Dakota Gold Announces Richmond Hill Assay Results and Key Design Decisions for Upcoming Pre-Feasibility Study

$DCPress releaseSep 28, 2026, 6:30 AM ETRead the release

Dakota Gold completed key PFS trade-off studies at Richmond Hill, selecting a 0.5-inch design crush size and a single heap-leach facility within the Phase 1 IACF footprint. Metallurgical testing showed modeled ultimate gold recovery averaging 80.4% at the 0.5-inch crush size versus 75.9% at 1-inch, and the consolidated configuration reduces geotechnical and execution risk. Final PFS assays were received, with 42,791 meters of 2025-2026 drilling (333 holes, 30% more data) feeding a resource update to be released with the PFS in Q4 2026; the PFS excludes transition material (~18% of prior heap-leach material).

Key figures

Pfs release
Q4 2026
Fs publication
mid-2027
New drill holes
333
Drilling added feet
140,389
Cn fa ratio threshold
≥0.82
Drilling added meters
42,791
Total sulfur threshold
≤0.5%
Maitland campaign meters
5578
Modeled gold recovery 1in
75.9%
Modeled gold recovery 0 5in
80.4%
Transition material excluded
18%
Maitland assays received meters
791
Drilling data increase vs prior resource
30%

AI analysis

Red flags3 · Pro

The rest of the AI analysis, red flags and sentiment are part of Signal8 Pro.

AI-generated analysis of a public disclosure. Not investment advice; verify against the original document.

    DC: Dakota Gold Announces Richmond Hill Assay Results and Key Design Decisions for Upcoming Pre-Feasibility Study — AI Analysis | Signal8