Skip to main content
Signal8

Cowboy State Mine Study Strengthens Foundation for Domestic U.S. Rare Earth Supply

$ARRPress releaseSep 30, 2026, 10:00 AM ET

American Rare Earths released an updated Scoping Study for the Cowboy State Mine, the first phase of Halleck Creek in Wyoming, estimating an after-tax NPV of approximately US$1.07 billion at an 8% real discount rate. The updated case lifts planned throughput 50% to 4.5 Mtpa, extends the mine life to 26 years, and raises average annual NdPr oxide output to about 2,500 tonnes, up 36% from the 2025 base case, with commissioning targeted for 2030/2031. Initial capital is estimated at US$900 million including contingency, materially exceeding ARR's current cash resources, with no committed financing beyond a non-binding EXIM Letter of Interest.

Key figures

Contingency
US$210 million
After tax irr
21%
Payback years
6.9
Closure capital
US$56 million
Initial capital
US$900 million
Mine life years
26
Throughput mtpa
4.5
After tax npv 8pct
US$1.07 billion
Ndpr recovery 2026
58.2%
After tax npv 10pct
US$764 million
Commissioning target
Year 2030/2031
Avg op cost per tonne rom
US$39.68/t
Ndpr price assumption per kg
US$151/kg
Annual ndpr oxide production tonnes
2500

AI analysis

Red flags6 · Pro

The rest of the AI analysis, red flags and sentiment are part of Signal8 Pro.

AI-generated analysis of a public disclosure. Not investment advice; verify against the original document.