Skip to main content
Signal8

Full Access with Signal8 Pro, $49/mo billed annually.

Freeport Provides Third-Quarter 2026 Operational Update

$FCXPress releaseOct 2, 2026, 8:00 AM ETRead the release

Freeport's Q3 2026 copper production of ~830 million pounds was in line with expectations, and copper sales should approximate the July estimate of 750 million pounds. Gold sales are tracking below plan at ~100 thousand ounces as ~60 thousand ounces of refined gold were deferred from Q3 to Q4 on timing in Indonesia, pushing unit net cash costs ~5% above the July $2.00/lb estimate. The Grasberg recovery remains on track, with mill throughput at ~67% of pre-incident rates and targets intact for 80% capacity by mid-2027 and full capacity by year-end 2027; the PTFI smelter restarted in late August 2026.

Key figures

Revenue
0
Deferred gold oz
60000
Gold production oz
230000
Copper production lbs
830000000
Gold sales estimate oz
100000
Copper sales estimate lbs
750000000
Unit cost vs july estimate
approximately 5% above
Grasberg mill throughput tpd
140000
Realized copper price per lb
>$6.50
July unit net cash cost per lb
2
Grasberg block cave throughput tpd
70000
Smelting capacity tonnes per annum
800000
Grasberg throughput pct of normalized
67%

AI analysis

Red flags3 · Pro

The rest of the AI analysis, red flags and sentiment are part of Signal8 Pro.

AI-generated analysis of a public disclosure. Not investment advice; verify against the original document.