Skip to main content
Signal8

Full Access with Signal8 Pro, $49/mo billed annually.

Contango Intersects 140.23 g/t Gold over 0.63 Meters and 18.16 g/t Gold over 3.65 Meters at Lucky Shot and Advances KM Vein Drilling

$CTGOPress releaseOct 6, 2026, 8:00 AM ETRead the release

Contango reported new surface drill results from Lucky Shot, headlined by 140.23 g/t gold over 0.63 meters and 18.16 g/t over 3.65 meters, with visible gold observed in multiple holes. The 2026 surface program drilled roughly 5,800 meters in 27 holes, and underground development is 54% complete with KM vein drilling 10 of 17 planned holes done.

Key figures

Best interval
140.23 g/t Au over 0.63 meters
Surface holes
27
Target feasibility
updated MRE H1 2027, feasibility targeting 5-year mine plan
Second best interval
18.16 g/t Au over 3.65 meters
Km vein holes planned
17
Surface meters drilled
5800
Km vein holes completed
10
Target annual production oz
40,000 to 50,000
Underground development planned m
830
Underground development completed m
450
Underground development complete pct
54%

AI analysis

Red flags3 · Pro

The rest of the AI analysis, red flags and sentiment are part of Signal8 Pro.

AI-generated analysis of a public disclosure. Not investment advice; verify against the original document.