Q2 Metals Extends Near Surface Mineralization 100 Metres North at the Cisco Lithium Project, Intercepting 134.5 Metres at 1.20% Li₂O and 101.6 Metres at 1.02% Li₂O
Q2 Metals extended known mineralization 100 metres north at the Cisco Lithium Project, with hole CS26-096 intercepting 134.5 m at 1.20% Li2O starting at surface. A 101.6 m interval at 1.02% Li2O in the same hole sits entirely outside the conceptual pit-shell from the April-2026 MRE, which totals 295 Mt inferred at 1.36% Li2O, underscoring resource growth potential. The 2026 summer program has completed 19,521 m over 43 holes with five rigs running, and the inaugural PEA remains on track for Fall-2026.
Key figures
- Pea timing
- Fall-2026
- Best interval
- 134.5 m at 1.20% Li2O (from surface)
- Cash position
- $70.9 million (Aug 31, 2026)
- Inferred resource
- 295 Mt at 1.36% Li2O
- Total drilled to date
- 61,045 m across 137 holes
- Drilling completed 2026
- 19,521 m over 43 holes
AI analysis
Red flags2 · Pro
The rest of the AI analysis, red flags and sentiment are part of Signal8 Pro.
AI-generated analysis of a public disclosure. Not investment advice; verify against the original document.