Skip to main content
Signal8

Curtiss-Wright Installs Stage 1 Simulator at TerraPower’s Natrium Site in Kemmerer, WY

$CWPress releaseOct 14, 2026, 9:00 AM ETRead the release

Curtiss-Wright delivered and installed the Stage 1 full-scope Training Simulator at TerraPower's Natrium site in Kemmerer, Wyoming, built on its 3KEYMASTER simulation platform. The simulator supports operator training and licensing for what is expected to be the first utility-scale advanced nuclear plant, a 345 MW sodium-cooled fast reactor that can boost output to 500 MW via molten-salt energy storage.

Key figures

Natrium base output mw
345
Natrium boosted output mw
500

AI analysis

The rest of the AI analysis, red flags and sentiment are part of Signal8 Pro.

AI-generated analysis of a public disclosure. Not investment advice; verify against the original document.