Silvercorp Reports Operational Results and Financial Results Release Date for the Second Quarter, Fiscal 2027
Silvercorp reported Q2 Fiscal 2027 operational results with revenue of $72.1 million, down 13% year-over-year on sharply lower production. Ying Mining District output fell 41-51% across silver, gold, silver equivalent, lead, and zinc, in line with the 40-50% impact previously disclosed in June 2026; production has resumed and ended the quarter at a 90% operating rate, while record-high realized prices ($61.83/oz silver, $3,955/oz gold) cushioned the revenue hit. The GC Mine remains suspended pending an updated mine design, with resumption not expected until November 2027; Silvercorp says GC contributes less than 10% of revenue.
Key figures
- Revenue
- 72100000
- Revenue Yoy
- -13%
- Safety capex q2
- 13400000
- Gc resume target
- November 2027
- Gold produced oz
- 1371
- El domo rain days
- 77
- Lead produced mlb
- 7.6
- Zinc produced mlb
- 0.7
- Silver produced moz
- 0.9
- Ore processed tonnes
- 213320
- Production decline zinc
- -51%
- Ying operating rate pct
- 90
- Production decline silver
- -41%
- Realized gold price usd oz
- 3955
- Realized silver price usd oz
- 61.83
- Silver equivalent produced moz
- 1
AI analysis
The rest of the AI analysis, red flags and sentiment are part of Signal8 Pro.
AI-generated analysis of a public disclosure. Not investment advice; verify against the original document.