Nevada Led the Nation in Tungsten in the 1950s. Its Old Camps Are Lining Up Drill Rigs Again.
This is a paid promotional commentary by U.S. Metal News (Market Equities Limited), sponsored by Western Star Resources under a US$100,000 investor-awareness agreement, surveying Nevada tungsten and gold exploration. GMTL is mentioned as one of several companies: Guardian previously reported Phase II drilling at Tempiute intersecting 92.0 metres at 0.34% WO3, with underground rehabilitation expected to commence in October 2026 and first production targeted at Pilot Mountain in Q4 2028.
Key figures
- I80 granite creek npv
- $118M at $2,750/oz Au
- Lac doe loan advances
- $1.209 billion
- Hycroft best intercept
- 19.6m at 30.49 g/t Au and 1,726.72 g/t Ag
- Gmtl tempiute intercept
- 92.0m at 0.34% WO3 from 102.5m (incl. 12.7m at 0.53% WO3), hole TP26-046
- Western star drill program
- 10 holes, ~5,000 feet
- Lac thacker pass phase1 capacity
- 40,000 t/yr lithium carbonate
- Gmtl pilot mountain first production target
- Q4 2028
AI analysis
Red flags4 · Pro
The rest of the AI analysis, red flags and sentiment are part of Signal8 Pro.
AI-generated analysis of a public disclosure. Not investment advice; verify against the original document.