Skip to main content
Signal8

IAMGOLD Provides Update on Côté Gold Mine Operations Ahead of Mine Tour

$IAGPress releaseOct 21, 2026, 4:45 PM ETRead the release

IAMGOLD reported preliminary Q3 2026 Côté Gold production of 64,400 attributable ounces (92,000 on a 100% basis), with record quarterly mining volumes of 12.4 million tonnes and a record September plant throughput of 37,100 tpd, above the 36,000 tpd nameplate. The quarter was the first full quarter without external contractor crushing, which management says is driving processing cost improvements, though recoveries slipped to 90% due to downtime on one of two Vertimills. 2026 attributable production is expected at the lower end of the 270,000-310,000 oz guidance range, with Q4 expected higher on better grades and processing rates.

Key figures

Q3 recovery
90%
Strip ratio
2.3:1
Nameplate tpd
36,000
Mining volumes Q3 mt
12.4
Mill throughput Q3 mt
2.9
Guidance attributable oz
270,000-310,000 oz (lower end expected)
Q3 production 100pct koz
92
September throughput tpd
37,100
Ytd production 100pct koz
262.9
Target processing rate tpd
40,000
Q3 production attributable koz
64.4
Ytd production attributable koz
184

AI analysis

Red flags3 · Pro

The rest of the AI analysis, red flags and sentiment are part of Signal8 Pro.

AI-generated analysis of a public disclosure. Not investment advice; verify against the original document.