Viridian Intersects 15m of 1.1% CuEq in 1.5km Step-Out Drilling at Kraken Main
Viridian Metals reported first assays from its southern step-out program at Kraken, intersecting 15.05 metres at 1.09% CuEq within 40.8 metres at 0.63% CuEq about 1.5 km south of prior drilling. Both holes were mineralized from the top of bedrock to end of hole, with intercepts exceeding 30 metres — more than three times the 8.6-metre average thickness underpinning the initial Exploration Target.
Key figures
- Best interval
- 15.05m at 1.09% CuEq within 40.8m at 0.63% CuEq (VKS26-062)
- Second interval
- 23.0m at 0.44% CuEq including 10.85m at 0.72% CuEq (VKS26-060)
- Pending intervals
- 41.8m and 47.3m visually identified sulphide intervals
- Step out distance
- 1.5 km south of previous drilling
- Drill holes completed 2026
- 27
- Exploration target avg thickness
- 8.6m vs 30m+ confirmed intercepts
AI analysis
Red flags4 · Pro
The rest of the AI analysis, red flags and sentiment are part of Signal8 Pro.
AI-generated analysis of a public disclosure. Not investment advice; verify against the original document.