Perpetua Announces New Gold Discovery at Stibnite Gold Project & Continued High Grades from Clark Tunnel Fault Zone
Perpetua announced a new gold discovery at the Fiddle prospect, where first drill hole SB633 returned 109.7 meters of 3.2 g/t gold and 1.1% antimony — one of the broadest continuous intercepts at Stibnite to date, at grades more than double the project's life-of-mine average. Follow-up drilling at the Clark Tunnel Fault Zone, partly within the permitted Yellow Pine pit, returned 25.4 meters of 4.5 g/t gold and 25.0 meters of 2.3 g/t gold at near-surface depths, with antimony and tungsten assays pending.
Key figures
- Ctfz intervals
- ["25.4 m @ 4.5 g/t Au (SB606)","25.0 m @ 2.3 g/t Au (SB605)"]
- Drill program meters
- over 16,000 meters of 2026 core drilling
- Strike length traced
- approximately 600 meters along MCFZ
- Fiddle discovery interval
- 109.7 m @ 3.2 g/t Au, 1.1% Sb (SB633)
AI analysis
Red flags3 · Pro
The rest of the AI analysis, red flags and sentiment are part of Signal8 Pro.
AI-generated analysis of a public disclosure. Not investment advice; verify against the original document.