Skip to main content
Signal8

Sierra Madre Commences 30,000 Metre Drill Program in the East District of La Guitarra

$SMPress releaseNov 5, 2026, 7:00 AM ETRead the release

Sierra Madre has commenced a 30,000 metre drill program in the East District of its Guitarra silver-gold mine complex in Estado de Mexico, targeting vein systems with a combined strike length of over 39 km. Initial drilling from the Tlacotal staging area will target the Magdalena and Los Locos vein systems with 11 holes to depths exceeding 1,000 meters, guided by a new 3D geological model. Separately, the company reported October mill throughput averaged 751 tonnes per day, a 50% increase above its 500 tpd nameplate capacity and in line with its Phase 1 expansion goal.

Key figures

Initial holes
11
Target depth m
1000
Drill program metres
30,000
Vein strike length km
39
Nameplate capacity tpd
500
Throughput increase pct
50%
Exploration potential grade
2.4 to 3.6 g/t gold and 440 to 670 g/t silver
Exploration potential tonnes
0.77 to 1.54 million tonnes
Mill throughput tpd oct 2026
751

AI analysis

Red flags3 · Pro

The rest of the AI analysis, red flags and sentiment are part of Signal8 Pro.

AI-generated analysis of a public disclosure. Not investment advice; verify against the original document.