Sierra Madre Commences 30,000 Metre Drill Program in the East District of La Guitarra
Sierra Madre has commenced a 30,000 metre drill program in the East District of its Guitarra silver-gold mine complex in Estado de Mexico, targeting vein systems with a combined strike length of over 39 km. Initial drilling from the Tlacotal staging area will target the Magdalena and Los Locos vein systems with 11 holes to depths exceeding 1,000 meters, guided by a new 3D geological model. Separately, the company reported October mill throughput averaged 751 tonnes per day, a 50% increase above its 500 tpd nameplate capacity and in line with its Phase 1 expansion goal.
Key figures
- Initial holes
- 11
- Target depth m
- 1000
- Drill program metres
- 30,000
- Vein strike length km
- 39
- Nameplate capacity tpd
- 500
- Throughput increase pct
- 50%
- Exploration potential grade
- 2.4 to 3.6 g/t gold and 440 to 670 g/t silver
- Exploration potential tonnes
- 0.77 to 1.54 million tonnes
- Mill throughput tpd oct 2026
- 751
AI analysis
The rest of the AI analysis, red flags and sentiment are part of Signal8 Pro.
AI-generated analysis of a public disclosure. Not investment advice; verify against the original document.