First Majestic Reports Positive Exploration Results at Jerritt Canyon and Provides Restart Progress Update
First Majestic reported positive 2026 exploration drilling at the Saval open-pit area of its Jerritt Canyon Gold Mine in Nevada, with highlights including 36.6 m at 5.87 g/t Au (including 9.1 m at 19.67 g/t Au) and 48.8 m at 4.24 g/t Au. The 2026 surface program has completed 15,983 m across 146 holes, with assays still pending for many holes; results support potential open-pit mill feed alongside the underground restart plan. Jerritt Canyon remains on track for a targeted restart in the second half of 2027, with an updated NI 43-101 technical report expected at the end of Q1 2027 and a vertical roller mill replacement key to the plan.
Key figures
- Best intercept
- 36.6 m at 5.87 g/t Au incl. 9.1 m at 19.67 g/t Au (SC-26-023)
- Other highlight
- 48.8 m at 4.24 g/t Au incl. 19.8 m at 7.39 g/t Au (SC-26-030)
- Land acquisition
- 2,971 acres (1,202 hectares) adjacent property
- Targeted restart
- second half of 2027
- Total drilling completed
- 15,983 m across 146 holes
AI analysis
The rest of the AI analysis, red flags and sentiment are part of Signal8 Pro.
AI-generated analysis of a public disclosure. Not investment advice; verify against the original document.