Skip to main content
Signal8

ExxonMobil starts production at Uaru, raising Guyana’s installed capacity to 1.1 million barrels per day

$XOMPress releaseNov 16, 2026, 10:19 AM ETRead the release

ExxonMobil started production at Uaru, the fifth development on Guyana's Stabroek block, raising installed capacity to 1.1 million barrels per day. The Errea Wittu FPSO joins four vessels already online and is expected to reach its initial 250,000 bpd capacity in Q1 2027, with two million barrels of storage.

Key figures

Full capacity target
initial 250,000 bpd capacity expected in Q1 2027
Errea wittu capacity bpd
250,000
Fpso storage capacity bbl
2 million
Exxon stabroek interest pct
45%
Guyana installed capacity bpd
1.1 million

AI analysis

The rest of the AI analysis, red flags and sentiment are part of Signal8 Pro.

AI-generated analysis of a public disclosure. Not investment advice; verify against the original document.

    XOM: ExxonMobil starts production at Uaru, raising Guyana’s installed capacity to 1.1 million barrels per day — AI Analysis | Signal8