ExxonMobil starts production at Uaru, raising Guyana’s installed capacity to 1.1 million barrels per day
ExxonMobil started production at Uaru, the fifth development on Guyana's Stabroek block, raising installed capacity to 1.1 million barrels per day. The Errea Wittu FPSO joins four vessels already online and is expected to reach its initial 250,000 bpd capacity in Q1 2027, with two million barrels of storage.
Key figures
- Full capacity target
- initial 250,000 bpd capacity expected in Q1 2027
- Errea wittu capacity bpd
- 250,000
- Fpso storage capacity bbl
- 2 million
- Exxon stabroek interest pct
- 45%
- Guyana installed capacity bpd
- 1.1 million
AI analysis
The rest of the AI analysis, red flags and sentiment are part of Signal8 Pro.
AI-generated analysis of a public disclosure. Not investment advice; verify against the original document.