Surge Copper Announces Results of Berg Pre-Feasibility Study with After-Tax NPV8% of C$4.6 billion and 24% IRR
Surge Copper released its Pre-Feasibility Study for the Berg Copper Project, reporting a base-case after-tax NPV of C$4.6 billion and a 24% IRR based on long-term metal prices. The study established a maiden Proven and Probable Mineral Reserve of 1.2 billion tonnes grading 0.22% copper, containing 5.8 billion pounds of copper and significant by-product molybdenum, silver, and gold.
Key figures
- Eps
- 0
- Eps Beat
- 0
- Revenue
- 0
- Revenue Yoy
- 0
- Deal Value Usd
- 0
- Offering Price
- 0
- Shares Offered
- 0
- Irr
- 24%
- Mine life
- 28 years
- Npv 8 pct
- C$4.6 billion
- C1 cash cost
- US$1.95/lb payable CuEq
- Initial capex
- C$4.7 billion
- Spot case irr
- 36%
- Spot case npv
- C$9.4 billion
- Contained gold
- 0.8 million ounces
- Payback period
- 2.9 years
- Reserve tonnes
- 1.2 billion tonnes
- Contained copper
- 5.8 billion pounds
- Contained silver
- 160 million ounces
- Reserve grade cu
- 0.22%
- Sustaining capex
- C$1.7 billion
- Contained molybdenum
- 687 million pounds
- Avg annual production cu
- 176 million pounds
AI analysis
Red flags3 · Pro
The rest of the AI analysis, red flags and sentiment are part of Signal8 Pro.
AI-generated analysis of a public disclosure. Not investment advice; verify against the original document.