Skip to main content
Signal8

C3 Metals Significantly Expands Copper Mineralization at Khaleesi Project, Peru with 67.6 Metres at 0.51% Copper Equivalent and 60.9 Metres of 0.55% Copper Equivalent in Two New Skarn Discoveries

$FCXPress releaseJun 24, 2026, 7:00 AM ETRead the release

C3 Metals reported drill results from its 100%-owned Khaleesi project in Peru, highlighting two new skarn discoveries with intercepts of 67.6m at 0.51% CuEq and 60.9m at 0.55% CuEq. The release notes that Freeport-McMoRan holds an earn-in option on C3 Metals' Jamaica assets, but the Khaleesi project is located in Peru and is not part of that agreement.

Key figures

Total drilling km
13,600m
Fcx jamaica option cap
$75,000,000
Khaleesi manto interval
4.2m at 3.16% CuEq
Khaleesi skarn 1 interval
67.6m at 0.51% CuEq
Khaleesi skarn 2 interval
60.9m at 0.55% CuEq
Fcx jamaica option hectares
13,020

AI analysis

The rest of the AI analysis, red flags and sentiment are part of Signal8 Pro.

AI-generated analysis of a public disclosure. Not investment advice; verify against the original document.