C3 Metals Significantly Expands Copper Mineralization at Khaleesi Project, Peru with 67.6 Metres at 0.51% Copper Equivalent and 60.9 Metres of 0.55% Copper Equivalent in Two New Skarn Discoveries
C3 Metals reported drill results from its 100%-owned Khaleesi project in Peru, highlighting two new skarn discoveries with intercepts of 67.6m at 0.51% CuEq and 60.9m at 0.55% CuEq. The release notes that Freeport-McMoRan holds an earn-in option on C3 Metals' Jamaica assets, but the Khaleesi project is located in Peru and is not part of that agreement.
Key figures
- Total drilling km
- 13,600m
- Fcx jamaica option cap
- $75,000,000
- Khaleesi manto interval
- 4.2m at 3.16% CuEq
- Khaleesi skarn 1 interval
- 67.6m at 0.51% CuEq
- Khaleesi skarn 2 interval
- 60.9m at 0.55% CuEq
- Fcx jamaica option hectares
- 13,020
AI analysis
The rest of the AI analysis, red flags and sentiment are part of Signal8 Pro.
AI-generated analysis of a public disclosure. Not investment advice; verify against the original document.