Skip to main content
Signal8

Kodiak Increases Drill Program to 16,500 Metres and Adds Second Drill Rig

$KDKPress releaseJun 29, 2026, 6:09 AM ETRead the release

Kodiak Copper Corp. has expanded its fully funded 2026 exploration program at the MPD project from 6,500 metres to 16,500 metres and mobilized a second drill rig to accelerate drilling. Drilling has commenced at the Ketchan deposit with 2,546 meters completed in 14 holes; the company plans to test multiple deposits and priority targets throughout the year.

Key figures

Drill metres total
16,500
Prospective targets
36
Drill metres initial
6500
Ketchan holes drilled
14
Ketchan metres drilled
2546

AI analysis

The rest of the AI analysis, red flags and sentiment are part of Signal8 Pro.

AI-generated analysis of a public disclosure. Not investment advice; verify against the original document.