Lightpath to Deliver AI-Grade Fiber Infrastructure to Two New Hyperscale Data Center Campuses
Lightpath, a subsidiary of Optimum Communications (OPTU), announced it will build AI-grade fiber infrastructure for two hyperscale data center campuses located in Saline, Michigan and Port Washington, Wisconsin. Each campus is planned to exceed one gigawatt of capacity, with the Saline build expected by the end of 2026 and the Port Washington build following in the second quarter of 2027.
Key figures
- Campus capacity gw
- 1
- Number of campuses
- 2
AI analysis
The rest of the AI analysis, red flags and sentiment are part of Signal8 Pro.
AI-generated analysis of a public disclosure. Not investment advice; verify against the original document.