Lunda Construction Awarded Roberts Street Railroad Bridge Replacement Project in Minnesota
Lunda Construction, a subsidiary of Tutor Perini, was awarded the Roberts Street Railroad Bridge Replacement Project in St. Paul, Minnesota. The project involves replacing a 113-year-old vertical lift bridge with a new 215-foot rolling bascule truss span, including significant substructure and approach work.
Key figures
- Project duration
- July 2026 to December 2029
- New bridge length ft
- 215
- Old bridge age years
- 113
- Old bridge length ft
- 189
- New bumper diameter ft
- 38
AI analysis
Red flags1 · Pro
The rest of the AI analysis, red flags and sentiment are part of Signal8 Pro.
AI-generated analysis of a public disclosure. Not investment advice; verify against the original document.