Wallbridge Reports Latest Results from 2026 Martiniere Drill Program, Mineralization Continues to Expand Along Bug Lake Corridor
Wallbridge reported assay results from the final four holes of its 2026 Phase 1 drilling campaign at the Martiniere project, highlighting high-grade intercepts including 36.10 g/t Au over 0.5 metres. The company stated that the results reinforce confidence in the scale and continuity of the gold system, noting that drilling since 2025 has expanded the mineralized footprint beyond current resource limits.
Key figures
- Inferred resource oz
- 387000
- Indicated resource oz
- 346000
- Phase 1 metres drilled
- 4108
- Highest grade intercept
- 36.10 g/t Au over 0.5 m
- Program total metres planned
- 17000
AI analysis
Red flags2 · Pro
The rest of the AI analysis, red flags and sentiment are part of Signal8 Pro.
AI-generated analysis of a public disclosure. Not investment advice; verify against the original document.