Skip to main content
Signal8

Full Access with Signal8 Pro, $49/mo billed annually.

REG-Trekor Announces 36 Million Pounds of Copper Production from Gibraltar and Florence Copper in the Second Quarter

$TKOPress releaseJul 14, 2026, 8:30 AM ETRead the release

Trekor reported Q2 production of 30.3 million pounds of copper and 559,000 pounds of molybdenum at the Gibraltar mine, with sales totaling 32.2 million pounds of copper. At the Florence Copper facility, production reached 5.2 million pounds of copper cathode, meeting management expectations as the ramp-up advanced smoothly and the facility reached steady-state operations.

Key figures

Guidance
2026 Gibraltar 110-115 million lbs; 2026 Florence Copper 30-35 million lbs
Florence flow rate gpm
3400
Florence pls grades gpl
1.8
Florence copper sales lbs
5300000
Florence production wells
110
Gibraltar copper sales lbs
32200000
Florence copper production lbs
5200000
Gibraltar copper production lbs
30300000
Gibraltar molybdenum production lbs
559000

AI analysis

Red flags1 · Pro

The rest of the AI analysis, red flags and sentiment are part of Signal8 Pro.

AI-generated analysis of a public disclosure. Not investment advice; verify against the original document.