Nine Mile Metals Announces Completion of DDH WD-26-03, and Confirms Continued Mineralization at the Wedge Deposit
Nine Mile Metals reported the completion of drill hole WD-26-03 at the Wedge Deposit, intersecting pyrite and chalcopyrite mineralization over a 125.25-meter interval down to 395 meters depth. The hole cut 2.40 meters of massive sulphides with visual estimates ranging from 40-50% pyrite and 4-7% chalcopyrite, extending mineralization intersected in a previous hole.
Key figures
- Hole id
- WD-26-03
- Visual pyrite pct
- 40-50%
- Final depth meters
- 395
- Interval to meters
- 338.2
- Interval from meters
- 212.95
- Program length meters
- 10000
- Visual chalcopyrite pct
- 4-7%
- Mineralized interval meters
- 125.25
- Massive sulphide width meters
- 2.4
- Mineralized core to date meters
- 490
- Massive sulphide interval meters
- 309.60-312.00
AI analysis
Red flags2 · Pro
The rest of the AI analysis, red flags and sentiment are part of Signal8 Pro.
AI-generated analysis of a public disclosure. Not investment advice; verify against the original document.