Olenox Industries Reports June 2026 Bitcoin Production
Olenox Industries reported June 2026 Bitcoin production of approximately 14.92 BTC, down from the prior month, as summer heat in Texas led to increased curtailment and low-power-mode operation. Average operational hashrate was 1.06 EH/s, representing 67% fleet utilization compared to 81% in May, due to deliberate steps to protect hardware from elevated ambient temperatures.
Key figures
- Avg hashrate
- 1.06 EH/s
- Bitcoin mined
- 14.92 BTC
- Miners installed
- 9584
- Fleet utilization
- 67%
- Nameplate hashrate
- 2.19 EH/s
- Targeted power cost
- sub-$0.02 per kWh
- Installed capacity mw
- 35
AI analysis
The rest of the AI analysis, red flags and sentiment are part of Signal8 Pro.
AI-generated analysis of a public disclosure. Not investment advice; verify against the original document.