Tiger Gold Drills 685 m @ 0.6 g/t Au from Surface and 568 m @ 0.6 g/t Au at Ceibal
Tiger Gold reported assay results from three drillholes at the Ceibal target, highlighted by CEDDH-011 intersecting 685.35 m @ 0.6 g/t Au from surface and CEDDH-012 returning 568.4 m @ 0.6 g/t Au from depth. These results extend the mineralized corridor to approximately 800 m below surface and outline an apparent strike length of at least 300 m, with all holes ending in mineralization.
Key figures
- Apparent width
- 375 metres
- Total drill program
- 20,000 metres
- Vertical depth trace
- 800 metres
- Apparent strike length
- 300 metres
- Drill hole 011 interval
- 685.35 m @ 0.6 g/t Au from surface
- Drill hole 012 interval
- 568.4 m @ 0.6 g/t Au from 309.5 m downhole
- Drill hole 013 interval
- 536 m @ 0.4 g/t Au from surface
- Resource estimate timeline
- Q1 2027
AI analysis
Red flags3 · Pro
The rest of the AI analysis, red flags and sentiment are part of Signal8 Pro.
AI-generated analysis of a public disclosure. Not investment advice; verify against the original document.