Americas Gold and Silver Corporation Announces Second Quarter Production
Americas Gold reported Q2 consolidated silver production of 665,000 ounces, down 15% sequentially due to an electrical fire at the Galena Complex. Despite the interruption, the company completed Phase 2 of the No. 3 Shaft modernization, increasing hoisting capacity by 150%, and eliminated over $85 million in variable future debt obligations.
Key figures
- Guidance
- full-year 2026 silver guidance of between 3.2 to 3.6 million ounces at all-in sustaining costs of US$30-US$35 per ounce
- Silver sold oz
- 624000
- Cash balance usd
- 89000000
- Lead produced lbs
- 2300000
- Silver produced oz
- 665000
- Copper produced lbs
- 850000
- Debt eliminated usd
- 85000000
- Antimony produced lbs
- 97000
- H1 silver production oz
- 1500000
AI analysis
Red flags2 · Pro
The rest of the AI analysis, red flags and sentiment are part of Signal8 Pro.
AI-generated analysis of a public disclosure. Not investment advice; verify against the original document.