Skip to main content
Signal8

Full Access with Signal8 Pro, $49/mo billed annually.

INTEGRA REPORTS RECORD MINING AND ORE-STACKING RATES AT FLORIDA CANYON, 30% INCREASE IN SECOND QUARTER GOLD PRODUCTION

$ITRGPress releaseJul 23, 2026, 4:05 PM ETRead the release

Florida Canyon gold production increased 30% quarter-over-quarter to 16,379 ounces in Q2 2026, driven by record total material movement and a 45% increase in ore placed on heap leach pads. The mine achieved an average mining rate of 87,867 tonnes per day with a strip ratio of 0.81, reflecting the successful integration of new mining equipment.

Key figures

Guidance
70,000 to 75,000 ounces
Strip ratio
0.81
Ore mined kt
4417
Mining rate tpd
87867
Q2 gold produced oz
16379
Ytd gold produced oz
29014
Cash and equivalents usd
111132000
Qoq production increase pct
30
Technical report after tax fcf billion
0.8

AI analysis

The rest of the AI analysis, red flags and sentiment are part of Signal8 Pro.

AI-generated analysis of a public disclosure. Not investment advice; verify against the original document.