Metalsource Mining Extends Strike Length of Mineralization at Silver Hill with 65m South Step Out from SH26-19
Metalsource Mining announced that drill hole SH26-27 extended the Silver Hill mineralized system 65 meters south of hole SH26-19, intersecting 15 meters of polymetallic mineralization. The visual core shows widespread sphalerite and galena with a 3.5-meter interval of semi-massive to massive sulphides, though laboratory assays remain pending to confirm grades.
Key figures
- Intercept length
- 15 metres
- Step out distance
- 65 metres
- Resource estimate target
- early 2027
- Massive sulphide interval
- 3.5 metres
AI analysis
The rest of the AI analysis, red flags and sentiment are part of Signal8 Pro.
AI-generated analysis of a public disclosure. Not investment advice; verify against the original document.