Skip to main content
Signal8

Full Access with Signal8 Pro, $49/mo billed annually.

INTEGRA FILES FEASIBILITY STUDY AND UPDATED LIFE OF MINE PLAN TECHNICAL REPORT FOR THE PRODUCING FLORIDA CANYON MINE

$ITRGPress releaseJul 30, 2026, 4:30 PM ETRead the release

Integra Resources filed a Feasibility Study for the Florida Canyon Mine, outlining a 74% increase in Proven and Probable reserves to 1.19 million ounces of gold. The updated Life of Mine Plan projects an 8-year operating life with a 17% increase in average annual production to 82,000 ounces, driving a base case after-tax NPV of $601 million.

Key figures

Aisc per oz
2331
After tax fcf
$0.8 billion
Mine life years
8
Reserves gold oz
1190000
Npv after tax 5pct
601000000
Reserve increase pct
74%
Avg annual production oz
82000
Life of mine gold sold oz
685000

AI analysis

The rest of the AI analysis, red flags and sentiment are part of Signal8 Pro.

AI-generated analysis of a public disclosure. Not investment advice; verify against the original document.