Osisko Gold Confirms Presence of Mineralized System with Open Pit Potential at the Proserpine Target on the Cariboo Gold Project's Regional Property; Exploration Drilling Highlights Include 95.93 g/t Au over 4.60 m at 71 m Vertical Depth and 5.46 g/t Au over 8.60 m at 77 m Vertical Depth
Osisko Gold reported high-grade drill results from the Proserpine target, located 7 km southeast of its permitted Cariboo Gold Project. The 14-hole program confirmed a mineralized system with intercepts including 95.93 g/t Au over 4.60 m at shallow depth, suggesting potential for open-pit mining.
Key figures
- Drill holes
- 14
- Metres drilled
- 6463
- Planned metres
- 26,500
- Highlight depth 1
- 71 m
- Highlight depth 2
- 77 m
- Highlight grade 1
- 95.93 g/t Au
- Highlight grade 2
- 5.46 g/t Au
- Highlight width 1
- 4.60 m
- Highlight width 2
- 8.60 m
- Distance to deposit km
- 7
AI analysis
The rest of the AI analysis, red flags and sentiment are part of Signal8 Pro.
AI-generated analysis of a public disclosure. Not investment advice; verify against the original document.