Skip to main content
Signal8

Osisko Gold Confirms Presence of Mineralized System with Open Pit Potential at the Proserpine Target on the Cariboo Gold Project's Regional Property; Exploration Drilling Highlights Include 95.93 g/t Au over 4.60 m at 71 m Vertical Depth and 5.46 g/t Au over 8.60 m at 77 m Vertical Depth

$OGGPress releaseAug 5, 2026, 7:02 AM ETRead the release

Osisko Gold reported high-grade drill results from the Proserpine target, located 7 km southeast of its permitted Cariboo Gold Project. The 14-hole program confirmed a mineralized system with intercepts including 95.93 g/t Au over 4.60 m at shallow depth, suggesting potential for open-pit mining.

Key figures

Drill holes
14
Metres drilled
6463
Planned metres
26,500
Highlight depth 1
71 m
Highlight depth 2
77 m
Highlight grade 1
95.93 g/t Au
Highlight grade 2
5.46 g/t Au
Highlight width 1
4.60 m
Highlight width 2
8.60 m
Distance to deposit km
7

AI analysis

The rest of the AI analysis, red flags and sentiment are part of Signal8 Pro.

AI-generated analysis of a public disclosure. Not investment advice; verify against the original document.