Skip to main content
Signal8

Full Access with Signal8 Pro, $49/mo billed annually.

Viridian Reports Continuation of Massive Sulphides at Kraken Main; First Assays Pending

$VRDNPress releaseAug 6, 2026, 3:02 PM ETRead the release

Viridian Metals reported visual observations from the 2026 drill program at the Kraken project, specifically regarding the extension of hole VKS25-024 which previously ended in mineralization. Massive to semi-massive sulphides were observed to continue for approximately 33 metres, transitioning to patchy net-textured sulphides to a final depth of 51 metres.

Key figures

Prior co grade percent
0.04
Prior cu grade percent
0.21
Prior ni grade percent
0.3
Prior cueq grade percent
0.77
Prior hole length metres
24.05
Hole extension depth metres
51
Massive sulphide interval metres
33

AI analysis

Red flags2 · Pro

The rest of the AI analysis, red flags and sentiment are part of Signal8 Pro.

AI-generated analysis of a public disclosure. Not investment advice; verify against the original document.