Skip to main content
Signal8

Maple Gold Reports Final Joutel Winter Drill Results, Including 8.6 g/t Gold over 4.2 Metres Within 2.5 g/t Gold over 18.3 Metres in the Eagle Mine Area, and Launches Expanded, Fully Funded 25,000 Metre Fall Drill Campaign

$MGMPress releaseAug 10, 2026, 7:00 AM ETRead the release

Maple Gold reported final winter drill results from the Joutel project, featuring high-grade intercepts such as 8.6 g/t gold over 4.2 metres within a broader 2.5 g/t interval over 18.3 metres, extending mineralization 450 metres beyond historical mine workings. The company noted these results were excluded from the recent maiden Joutel resource estimate, which comprises 126,000 indicated ounces and 992,000 inferred ounces, bringing the total Douay/Joutel project resources to over 5 million ounces.

Key figures

Treasury
$23 million
Fall drill metres
25,000
Fall program budget
$9 million
Winter drill metres
10,870
Historical production oz
1.1 million
Joutel inferred resource oz
992,000
Joutel indicated resource oz
126,000
Total douay joutel inferred oz
4.297 million
Total douay joutel indicated oz
905,000

AI analysis

The rest of the AI analysis, red flags and sentiment are part of Signal8 Pro.

AI-generated analysis of a public disclosure. Not investment advice; verify against the original document.