Skip to main content
Signal8

Full Access with Signal8 Pro, $49/mo billed annually.

Indonesia Energy Corporation Reports Progress on Drilling of K-29 Well

$INDOPress releaseAug 13, 2026, 7:30 AM ETRead the release

Indonesia Energy Corporation reported that its K-29 well has reached a depth of more than 2,500 feet and remains on schedule since being spudded on July 25. The company plans to conduct coring at approximately 3,000 feet to determine the optimal stimulation method before reaching the planned total depth of 3,400 feet.

Key figures

Current depth
more than 2,500 feet
Target zone depth
approximately 3,000 feet
Kruh block acreage
63000
Planned total depth
approximately 3,400 feet
Citarum block acreage
195000

AI analysis

The rest of the AI analysis, red flags and sentiment are part of Signal8 Pro.

AI-generated analysis of a public disclosure. Not investment advice; verify against the original document.

    INDO: Indonesia Energy Corporation Reports Progress on Drilling of K-29 Well — AI Analysis | Signal8