Hycroft Extends High-Grade Silver at Brimstone and Vortex
Hycroft Mining announced significant drill results from its 2025-2026 exploration program at the Hycroft Mine, confirming high-grade silver continuity at Brimstone and extending the system at Vortex. At Vortex, drilling extended the high-grade zone approximately 150 meters to the west, highlighted by hole H26D-6088 which intersected 12.5 meters at 375.41 g/t silver, including 4.2 meters grading 748.02 g/t silver. Meanwhile, Brimstone drilling confirmed continuity up-dip, with hole H26D-6169 returning 82.7 meters at 87.52 g/t silver and 0.77 g/t gold.
Key figures
- Vortex hole id
- H26D-6088
- Brimstone hole id
- H26D-6169
- Vortex ag grade gpt
- 375.41
- Drill meters planned
- 26000
- Vortex extension west
- approximately 150 meters
- Brimstone ag grade gpt
- 87.52
- Brimstone au grade gpt
- 0.77
- Drill meters completed
- 15585
- Vortex interval length m
- 12.5
- Brimstone interval length m
- 82.7
- Vortex high grade interval m
- 4.2
- Vortex high grade ag grade gpt
- 748.02
- Brimstone high grade interval m
- 19.4
- Brimstone high grade ag grade gpt
- 108.19
- Brimstone high grade au grade gpt
- 2.1
AI analysis
The rest of the AI analysis, red flags and sentiment are part of Signal8 Pro.
AI-generated analysis of a public disclosure. Not investment advice; verify against the original document.