Exploration Accelerated at BCM's 100% Controlled Thompson Knolls Project, Utah
BCM Resources has initiated ground-induced polarization and magnetotellurics surveys at its Thompson Knolls project, engaging contractor Zonge International for the 11-day program. Drilling of hole TK21 is underway, targeting a depth of at least 4,000 ft to test the western extension of the mineralizing system following a long intercept in TK20.
Key figures
- Survey duration days
- 11
- Hole tk21 target depth m
- 1219
- Hole tk21 target depth ft
- 4000
- Hole tk21 depth to bedrock m
- 488
- Hole tk21 depth to bedrock ft
- 1600
AI analysis
The rest of the AI analysis, red flags and sentiment are part of Signal8 Pro.
AI-generated analysis of a public disclosure. Not investment advice; verify against the original document.