Q2 Metals Drills Best Hole to Date Intersecting 403.7 Metres at 1.57% Li₂O and 213.8 Metres at 1.93% Li₂O in Hole 93 at the Cisco Lithium Project
Q2 Metals reported assay results from its 2026 summer drill program at the Cisco Lithium Project, highlighted by Hole 93 which intersected three wide zones including 403.7 metres at 1.57% Li2O and 213.8 metres at 1.93% Li2O. Management described the hole as the best drilled to date, confirming the western deposit's continuity at depth with approximately 170 metres of the wide interval occurring outside the prior conceptual pit shell.
Key figures
- Hole 93 interval 1
- 60.8 m at 1.24% Li2O
- Hole 93 interval 2
- 213.8 m at 1.93% Li2O
- Hole 93 interval 3
- 403.7 m at 1.57% Li2O
- Inferred resource mt
- 295
- Summer program holes
- 22
- Summer program meters
- 9552
- Inferred resource grade
- 1.36% Li2O
- Total project drilling m
- 50,000+
AI analysis
Red flags1 · Pro
The rest of the AI analysis, red flags and sentiment are part of Signal8 Pro.
AI-generated analysis of a public disclosure. Not investment advice; verify against the original document.