Skip to main content
Signal8

Q2 Metals Drills Best Hole to Date Intersecting 403.7 Metres at 1.57% Li₂O and 213.8 Metres at 1.93% Li₂O in Hole 93 at the Cisco Lithium Project

$QTWOPress releaseAug 25, 2026, 3:01 AM ET

Q2 Metals reported assay results from its 2026 summer drill program at the Cisco Lithium Project, highlighted by Hole 93 which intersected three wide zones including 403.7 metres at 1.57% Li2O and 213.8 metres at 1.93% Li2O. Management described the hole as the best drilled to date, confirming the western deposit's continuity at depth with approximately 170 metres of the wide interval occurring outside the prior conceptual pit shell.

Key figures

Hole 93 interval 1
60.8 m at 1.24% Li2O
Hole 93 interval 2
213.8 m at 1.93% Li2O
Hole 93 interval 3
403.7 m at 1.57% Li2O
Inferred resource mt
295
Summer program holes
22
Summer program meters
9552
Inferred resource grade
1.36% Li2O
Total project drilling m
50,000+

AI analysis

Red flags1 · Pro

The rest of the AI analysis, red flags and sentiment are part of Signal8 Pro.

AI-generated analysis of a public disclosure. Not investment advice; verify against the original document.

    QTWO: Q2 Metals Drills Best Hole to Date Intersecting 403.7 Metres at 1.57% Li₂O and 213.8 Metres at 1.93% Li₂O in Hole 93 at the Cisco Lithium Project — AI Analysis | Signal8