Skip to main content
Signal8

First Phosphate Reports Updated Mineral Resource Estimate for Bégin-Lamarche Phosphate Deposit

$PHOSPress releaseMay 26, 2026, 7:10 AM ETRead the release

First Phosphate announced a 378% increase in Indicated Mineral Resources for its Bégin-Lamarche phosphate deposit, driven by the 2025-2026 drilling program. The updated estimate reports 198.5 Mt at 6.00% P2O5 in the Indicated category, alongside 6.2 Mt at 7.70% in the Measured category and 89.5 Mt in the Inferred category.

Key figures

Drill holes
276
Drill meters
68345
Conversion ratio pct
91.1
Process recovery pct
88
Resource increase pct
378
Inferred resource grade pct
6.16
Inferred resource tonnes mt
89.5
Measured resource grade pct
7.7
Measured resource tonnes mt
6.2
Indicated resource grade pct
6
Indicated resource tonnes mt
198.5
Apatite concentrate grade pct
40.4

AI analysis

The rest of the AI analysis, red flags and sentiment are part of Signal8 Pro.

AI-generated analysis of a public disclosure. Not investment advice; verify against the original document.