High Tide Reports 91.4 Metres of 28.7% Fe & 112.6 Metres of 27.2% Fe from Labrador West Iron Project
High Tide Resources reported assay results from the Labrador West Iron Project, highlighting significant intercepts of 91.4 metres at 28.7% Fe and 112.1 metres at 27.2% Fe. The drilling extended iron oxide mineralization by over 1100 metres outside the current pit shell, with 22 holes now completed totaling more than 5,500 metres.
Key figures
- Total drilling m
- 5500
- Current resource mt
- 655
- Intercept length 1 m
- 91.4
- Intercept length 2 m
- 112.1
- Intercept grade 1 pct
- 28.7
- Intercept grade 2 pct
- 27.2
- Current resource grade pct
- 28.84
AI analysis
The rest of the AI analysis, red flags and sentiment are part of Signal8 Pro.
AI-generated analysis of a public disclosure. Not investment advice; verify against the original document.