Skip to main content
Signal8

Kodiak Reports Positive Results from Metallurgical Testwork on the MPD Project

$KDKPress releaseMay 28, 2026, 6:00 AM ETRead the release

Kodiak Copper reported positive results from its second metallurgical program on the MPD project, achieving rougher recoveries of 91.1% copper, 81.4% gold, and 80.4% silver at a coarser grind size of 150 µm. The first locked-cycle test confirmed stable flotation performance with cleaner concentrate recoveries of 78.7% copper, 60% gold, and 49.3% silver, reinforcing the project's amenability to traditional sulphide flotation.

Key figures

Grind size p80
150 µm
Concentrate grade ag
73 g/t
Concentrate grade au
8.2 g/t
Concentrate grade cu
18.3%
Gold recovery rougher
81.4%
Copper recovery rougher
91.1%
Silver recovery rougher
80.4%
Gold recovery locked cycle
60.0%
Copper recovery locked cycle
78.7%
Silver recovery locked cycle
49.3%

AI analysis

The rest of the AI analysis, red flags and sentiment are part of Signal8 Pro.

AI-generated analysis of a public disclosure. Not investment advice; verify against the original document.