Kodiak Reports Positive Results from Metallurgical Testwork on the MPD Project
Kodiak Copper reported positive results from its second metallurgical program on the MPD project, achieving rougher recoveries of 91.1% copper, 81.4% gold, and 80.4% silver at a coarser grind size of 150 µm. The first locked-cycle test confirmed stable flotation performance with cleaner concentrate recoveries of 78.7% copper, 60% gold, and 49.3% silver, reinforcing the project's amenability to traditional sulphide flotation.
Key figures
- Grind size p80
- 150 µm
- Concentrate grade ag
- 73 g/t
- Concentrate grade au
- 8.2 g/t
- Concentrate grade cu
- 18.3%
- Gold recovery rougher
- 81.4%
- Copper recovery rougher
- 91.1%
- Silver recovery rougher
- 80.4%
- Gold recovery locked cycle
- 60.0%
- Copper recovery locked cycle
- 78.7%
- Silver recovery locked cycle
- 49.3%
AI analysis
The rest of the AI analysis, red flags and sentiment are part of Signal8 Pro.
AI-generated analysis of a public disclosure. Not investment advice; verify against the original document.