Skip to main content
Signal8

Full Access with Signal8 Pro, $49/mo billed annually.

Viridian Intersects Over 50 Metres of Mineralization from Surface at Kraken Main

$VRDNPress releaseSep 8, 2026, 8:30 AM ETRead the release

Viridian Metals reported 50.15 metres of mineralization grading 0.68% CuEq starting at surface at the Kraken Main Zone in Labrador, after extending hole VKS25-024 to 51.15 metres. The extension more than doubles the previously reported 24.05-metre interval and includes 18.8 metres at 1.12% CuEq; CEO Tyrell Sutherland said mineralization begins at surface and continues beyond 50 metres depth, adding volume potential across the zone.

Key figures

Program end
drilling through end of October 2026
Best intercept
VKS25-024: 50.15m @ 0.68% CuEq from 1m
Rigs operating
2
Step out status
VKS26-059, VKS26-060 and VKS26-062 intersected visually identified semi-massive sulphides at top of bedrock; assays pending
Step out distances
["600m","900m","1.2km"]
Vks26 054 highlight
3.3m @ 1.68% CuEq from 0.7m and 15.2m @ 0.98% CuEq from 11.7m
Holes completed 2026
12
Cueq price assumptions
$4.00/lb Cu, $7.50/lb Ni, $15.00/lb Co, 80% recovery for Ni and Co
Drilling completed 2026
approximately 350m
Best high grade interval
18.8m @ 1.12% CuEq from 12.2m
Exploration target status
initial Kraken Main exploration target being finalized; excludes all 2026 drilling

AI analysis

Red flags6 · Pro

The rest of the AI analysis, red flags and sentiment are part of Signal8 Pro.

AI-generated analysis of a public disclosure. Not investment advice; verify against the original document.

    VRDN: Viridian Intersects Over 50 Metres of Mineralization from Surface at Kraken Main — AI Analysis | Signal8