Millennium Silver Receives BLM Acceptance of Exploration Notice and Posts Reclamation Bond at Silver Peak, Nevada
The BLM Tonopah Field Office accepted Millennium Silver's 43 CFR 3809 Exploration Notice as complete for the Silver Peak silver-gold project in Esmeralda County, Nevada, with the required reclamation bond accepted September 1, 2026. The Notice authorizes Notice-level diamond drilling -- up to five pads and a minimum of 10 holes -- until August 12, 2028, targeting infill and extension of the Nivloc Structure along roughly 900 m of strike to support an updated Mineral Resource Estimate.
Key figures
- Lode claims
- 211
- Ag cutoff gpt
- 40
- Drill pads max
- 5
- Gold grade gpt
- 0.67
- Drill holes min
- 10
- Silver grade gpt
- 96.85
- Contained gold koz
- 57
- Contained silver moz
- 8.26
- Silver equivalent moz
- 12.8
- Nivloc strike length m
- 900
- Notice effective until
- August 12, 2028
- Resource effective date
- March 28, 2019
- Inferred resource tonnes
- 2653000
- Reclamation bond accepted
- September 1, 2026
AI analysis
Red flags3 · Pro
The rest of the AI analysis, red flags and sentiment are part of Signal8 Pro.
AI-generated analysis of a public disclosure. Not investment advice; verify against the original document.