Skip to main content
Signal8

Full Access with Signal8 Pro, $49/mo billed annually.

Kinross Encounters Gold and Copper in Recent Drill Holes with Gold Values up to 6 g/t, Kinross Drilling to Continue on Dixie Halo

$BTUPress releaseSep 14, 2026, 8:00 AM ETRead the release

Kinross Gold's Phase 1 2026 drilling on BTU Metals' optioned Dixie Halo project in Red Lake intersected gold in every one of eight holes totaling 4,528.5 metres, with values up to 6 g/t gold. The drilling also encountered copper-silver mineralization, including 0.530% copper and 8.22 g/t silver over 16 metres, individual values of 8.41% copper and 116 g/t silver over 0.4 metres, and hole BTU-26-15 grading 0.626% copper and 12.61 g/t silver over 24.55 metres.

Key figures

Phase1 holes
8
Hole btu 26 15
24.55 m at 0.626% Cu and 12.61 g/t Ag
Copper interval
0.530% Cu and 8.22 g/t Ag over 16 m
Gold grade range
<1 g/t Au up to 6 g/t Au
Metres drilled 2025
8204.7
Hubcap program metres
approximately 1,200
Best individual interval
8.41% Cu and 116 g/t Ag over 0.4 m; 3.9% Cu and 71.8 g/t Ag
Kinross earn in interest
70%
Planned 2026 program metres
6,000-8,000

AI analysis

Red flags4 · Pro

The rest of the AI analysis, red flags and sentiment are part of Signal8 Pro.

AI-generated analysis of a public disclosure. Not investment advice; verify against the original document.