Olenox Industries Reports 15.63 Bitcoin Mined in August as Company Advances Energy-Powered Digital Infrastructure Strategy
Olenox Industries mined approximately 15.63 Bitcoin in August through its CS Digital Ventures subsidiary, its second monthly operating update since closing the CS Digital acquisition on May 28, 2026. The fleet averaged about 1.03 EH/s of operational hashrate, with realized hashrate at roughly 67% of economic capacity due to seasonal heat-related curtailment and low-power operation at Texas hosting sites. Installed capacity stands at 9,584 current-generation S21-class miners, roughly 35 MW and 2.19 EH/s nameplate, at about 16 joules per terahash.
Key figures
- Fleet miners
- 9584
- Btc mined august
- 15.63
- Installed capacity mw
- 35
- Nameplate hashrate ehs
- 2.19
- Operational hashrate ehs
- 1.03
- Cs digital acquisition date
- May 28, 2026
- Hardware efficiency j per th
- 16
- Target power cost usd per kwh
- below $0.02
- Realized hashrate pct of capacity
- 67%
AI analysis
The rest of the AI analysis, red flags and sentiment are part of Signal8 Pro.
AI-generated analysis of a public disclosure. Not investment advice; verify against the original document.