Skip to main content
Signal8

Full Access with Signal8 Pro, $49/mo billed annually.

FIRST MAJESTIC SILVER CORP (AG) Form 6-K — Sep 9, 2026

$AGForm 6-KFiled Sep 9, 2026, 7:34 AM ET0001062993-26-004861Original filing

First Majestic Silver reported high-grade drill results from its 2026 exploration program at the San Dimas Silver/Gold Mine in Durango, Mexico, with roughly 89,000 metres drilled year-to-date out of a planned approximately 117,000 metre program, one of the company's largest exploration campaigns. Standout intercepts include 0.88 m grading 2,604 g/t silver and 43.08 g/t gold (5,835 g/t silver-equivalent) at the Sinaloa-Elia vein complex, and 1.30 m grading 2,625 g/t silver and 58.25 g/t gold (6,994 g/t silver-equivalent) on the Luz vein in the El Cristo mine area. Infill drilling at Sinaloa-Elia supports conversion of Inferred Mineral Resources to Indicated.

Key figures

Cutoff grade
171 g/t AgEq minimum grade cut-off
Convencion vein offset
intersected approximately 100 m north of the Jessica vein
Top intercept el cristo
LUZ26X-02 (Luz vein): 1.30 m true width at 2,625 g/t Ag and 58.25 g/t Au (6,994 g/t AgEq), including 0.57 m at 15,706 g/t AgEq
Top intercept sinaloa elia
ELI26X-10: 0.88 m true width at 2,604 g/t Ag and 43.08 g/t Au (5,835 g/t AgEq)
Los gatos ownership percent
70
Planned drilling 2026 metres
117000
Drilling completed ytd 2026 metres
89000

AI analysis

Red flags3 · Pro

The rest of the AI analysis, red flags and sentiment are part of Signal8 Pro.

AI-generated analysis of a public disclosure. Not investment advice; verify against the original document.