Integra Resources Corp. (ITRG) Form 6-K — Sep 23, 2026
Integra Resources reported new drill results at its producing Florida Canyon Mine in Nevada, including 1.30 g/t Au over 62.5 m and 0.59 g/t Au over 167.6 m in the Inter-Pit area between the Central and Radio Tower open pits. A new target, Madre Shear North, returned 0.48 g/t Au over 54.9 m and represents the previously unmined northern extension of a gold-bearing structure that will become accessible as the North Dump is mined. About 30,140 m of RC drilling has been completed at Florida Canyon in 2026 to date, with roughly 2,000 m more planned at Madre Shear North and 7,000 m planned at the Standard Mine area.
Key figures
- Best intercept
- 1.30 g/t Au over 62.5 m (FCMR26-1250, Central/Radio Tower Saddle)
- Wide intercept
- 0.59 g/t Au over 167.6 m (FCMR26-1162)
- Reserve increase prior
- 74% increase in Mineral Reserves in July 2026 Technical Report
- Madre shear north intercept
- 0.48 g/t Au over 54.9 m (FCMR26-1284)
- Madre shear north phase one
- ~2,000 m drilled, ~2,000 m additional planned
- Meters drilled 2026 to date
- 30140
- Planned standard mine drilling
- 7,000 m
AI analysis
The rest of the AI analysis, red flags and sentiment are part of Signal8 Pro.
AI-generated analysis of a public disclosure. Not investment advice; verify against the original document.