Zentek Ltd. (ZTEK) Form 6-K — Oct 7, 2026
Zentek Ltd. announced that CEO Moe Jiwan has been invited to present Albany Graphite Project results at the 26th International Nuclear Graphite Specialists Meeting on October 22, 2026, in Osaka, Japan. At bench scale, Albany graphite was purified to 99.9992 wt.% carbon (2.60 ppm equivalent boron) and, in subsequent testing, to a maximum of 99.99985 wt.% carbon without hydrofluoric acid. The company makes no qualification claim and the material has not been irradiated.
Key figures
- Bench purity pct
- 99.9992
- Bench purity max pct
- 99.99985
- Equivalent boron ppm
- 2.6
- Pea 5n price usd per tonne
- 50000
- Iaea nuclear capacity 2050 low gw
- 561
- Iaea nuclear capacity 2050 high gw
- 992
AI analysis
Red flags3 · Pro
The rest of the AI analysis, red flags and sentiment are part of Signal8 Pro.
AI-generated analysis of a public disclosure. Not investment advice; verify against the original document.