GeoPark Ltd (GPRK) Form 6-K — Oct 15, 2026
GeoPark reported 3Q2026 consolidated production of 27,973 boepd, up 2.6% quarter-over-quarter, driven by stable Colombian operations and the start-up of Pad 1030 in Argentina's Vaca Muerta. Argentina gross production jumped 50.6% to 2,108 boepd after five fractured wells came online, with field production at Loma Jarillosa Este exceeding 5,000 boepd ahead of a factory drilling campaign. Exploration results were positive: Milano 1X tested ~1,000 bopd and Toritos Norte 2 tested ~1,100 bopd. The company is also advancing its strategic entry into Venezuela's Bare Block with PDVSA, targeting contract effectiveness and start of operations before end-2026.
Key figures
- Rigs in operation
- 8
- Milano 1x net pay feet
- 22
- Total production boepd
- 27973
- Wells drilled colombia
- 8
- Milano 1x test rate bopd
- 1000
- Colombia production boepd
- 25865
- Wells fractured argentina
- 5
- Cpo 5 net production boepd
- 6073
- Platanillo production boepd
- 862
- Toritos norte 2 net pay feet
- 34
- Production qoq change percent
- 2.6
- Production yoy change percent
- -1
- Llanos 34 net production boepd
- 15393
- Toritos norte 2 test rate bopd
- 1100
- Llanos 123 net production boepd
- 3538
- Argentina production boepd gross
- 2108
- Argentina production growth percent
- 50.6
- Waterflood contribution boepd gross
- 6745
- Loma jarillosa field production boepd
- 5000
AI analysis
The rest of the AI analysis, red flags and sentiment are part of Signal8 Pro.
AI-generated analysis of a public disclosure. Not investment advice; verify against the original document.